Skip to content
Remodel Carpenters logo
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement
Search
510-927-6300 
zack@remodelcarpenters.com
Remodel Carpenters logo
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement
Remodel Carpenters logo
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement
Search
510-927-6300 
zack@remodelcarpenters.com
Remodel Carpenters logo
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement

East Oakland Backer And Bath Walls, 2024

Uncategorized

This was an incredibly complex bathroom in an older East Oakland home: new backer on every wall, new tile throughout, a marble herringbone floor, a floating vanity, and a new toilet, all using materials the client selected. Starting behind the walls The walls themselves were more or less square, which in an older house is

East Oakland Backer And Bath Walls, 2024 Read More »

Complex Bathroom Backer and Tile in East Oakland, photo 29

2024 El Sobrante Shower Backer And Surround

Tile

This small stand-up shower in El Sobrante looked like a simple job. It was more challenging than it looked. A home in transition The family had been through a tragedy involving a child, and it was time to move on. The owner was remodeling the whole house ahead of a sale and co-managing much of

2024 El Sobrante Shower Backer And Surround Read More »

Shower Backer and Tile Surround in El Sobrante, photo 1

San Leandro Backsplash, And Drywall Repair, February, 2024

Uncategorized

Not every job fights back. This San Leandro kitchen backsplash, with some drywall repair, went unusually smoothly from start to finish, and it’s worth explaining why. The right tile for a simple install The client chose a glass mosaic with a mirrored foil backing. That backing made the whole job easier. Clear glass tile normally

San Leandro Backsplash, And Drywall Repair, February, 2024 Read More »

Kitchen Backsplash and Drywall Repair in San Leandro, photo 24

San Mateo Pergo Flooring, November 2023

engineered flooring, Laminate flooring

Some jobs go exactly to plan. In our experience that’s the minority, so it’s worth noting when it happens. This San Mateo condo got new Pergo laminate flooring, bought by the owner from Home Depot, and the installation went just as planned. Going over the old floor The condo had an old linoleum floor, and

San Mateo Pergo Flooring, November 2023 Read More »

Pergo Laminate Flooring in a San Mateo Condo, photo 6

San Francisco Restaurant (Market Street), May, 2023

Uncategorized

This Market Street restaurant in San Francisco needed a long list of cosmetic and finish work, and it was one of the more enjoyable jobs we’ve done, because it offered so much variety. A little of everything The scope covered most of what a commercial space needs to look finished: Filling gaps in the wall

San Francisco Restaurant (Market Street), May, 2023 Read More »

Restaurant Finish Work on Market Street, San Francisco, photo 113

SF Condo Tile Bath Surround And Floor, May, 2023

cabinets, Uncategorized

This San Francisco condo bath looked like a straightforward job: a subway tile tub surround and a new floor. It stopped being straightforward once I checked the fit of the tub, which I should have done first. A tub that didn’t fit its space The tub was about an inch too small for its footprint.

SF Condo Tile Bath Surround And Floor, May, 2023 Read More »

Condo Subway Tile Bath Surround and Floor, San Francisco, photo 19
← Previous 1 … 8 9 10 … 16 Next →
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
    • Tile Cost Estimator
    • Cabinet Install Cost Estimator
    • Painting Cost Estimator
    • Non-Tile Flooring Install Cost Estimator
  • About Us
    • Privacy Statement
  • Portfolio
  • Our System
  • Simple = beautiful
  • GC’s Are Overkill
  • Our Scope
  • Estimators
  • About Us

Copyright © 2026 Remodel Carpenters | Powered by Astra WordPress Theme